Data Center Onsite Power Generation Market (Power Source: Diesel Generators, Gas Generators, Renewable Energy, Fuel Cells and Others; Application: Backup Power, Primary Power and Peak Shaving; Generation Capacity: Up to 1 MW, 1-5 MW and Above 5 MW; Data Center Type: Hyperscale, Colocation and Enterprise; and Region: North America, Europe, Asia Pacific, Latin America and Middle East & Africa)- Global Industry Analysis, Shares, Growth, Trends and Forecast 2021-2036

| Format: PDF/PPT/Excel

| Product ID:

5066

| Report Version:

November 2026

Market Snappshot

  • Market Size in 2025: $US 13.1 Bn
  • Forecast Market by 2036: $US 30 Bn
  • CAGR for the Period 2026-2036: 7.9%
  • Top Region in Terms of Market Share: North America (45%)
  • Key Players: Caterpillar Inc., GE Vernova Inc., Cummins Inc., Wärtsilä Corporation, Bloom Energy Corporation, Siemens Energy AG, Mitsubishi Heavy Industries, Ltd., Rolls-Royce Holdings plc, Generac Holdings Inc., Kohler Energy, Doosan Enerbility Co., Ltd. and Others.

Analyst Viewpoint:

A data center that makes its own electricity is no longer an exception to the grid model; it is becoming a design decision taken on the first day of a project. When a utility cannot promise a connection for several years, a campus that can generate, store and manage its own power gains months of revenue, and that trade is now being made at gigawatt scale. We expect the market to shift its centre of gravity from standby diesel sets that run a few hours a year to gas turbines, large reciprocating engines and fuel cells that run as primary or bridge power, paired with batteries that smooth the variable loads of AI training and with a later link to the grid once it arrives. Equipment makers with factory capacity, fuel supply arrangements and the ability to deliver complete plants, not only engines, will set the pace, because delivery slots, not demand, are the scarce resource. Emissions rules, gas pipeline access and local permitting will decide where projects can be built, and hydrogen-ready designs, carbon capture and renewable-plus-storage hybrids are likely to widen the choice of fuel as rules tighten. The outlook is clear: onsite generation will move from a bridge to a permanent layer of the data center power stack, and by the mid-2030s many large campuses will be designed as self-supplied power plants with a grid connection as backup. To realize the full techno-commercial potential of onsite power generation, close collaboration between data center developers, equipment makers, gas suppliers, utilities and regulators will be essential.

Data Center Onsite Power Generation Market Overview:

Onsite power generation for data centers covers the generating equipment installed at or beside a data center to supply its electricity, whether as primary power, bridge power until a grid connection is ready, peak shaving or backup. The main technologies are diesel and gas generators, including gas turbines and reciprocating engines, fuel cells, and solar and wind generation, usually supported by battery storage and combined heat and power.

By power source, diesel generators lead with a 42.3% share and by application, backup power leads with 52.7%. By generation capacity, above 5 MW leads with a 36.8% share. In terms of data center type, hyperscale facilities lead the market with 44.6% share. By region, North America leads with an estimated 45% share, followed by Asia Pacific with 28% and Europe with 17%, while Latin America and Middle East & Africa together hold about 10%. Fuel cells and renewable energy are the fastest-growing power sources, primary power is expected to be the fastest-growing application, systems above 5 MW are expected to gain share as campuses move to gigawatt-scale plants, and Asia Pacific is expected to be among the fastest-growing regions.

The main trend in this market is the move from standby-only generation to prime and bridge power, with gas turbines, engines and fuel cells ordered years in advance and paired with batteries.
DriversGrid Connection Delays and the Race to Secure Power Quickly
 Order Backlogs and Capacity Expansion at Equipment Makers

Grid Connection Delays and the Race to Secure Power Quickly

Speed to power is now the first concern of data center developers. Energy-sector analysis shows that about 15 to 27 GW of onsite natural gas could power data centres by 2030, mostly in the United States, and satellite tracking shows that about one-fifth of US onsite gas projects have already begun land clearing or construction. Onsite gas also has to be built 30% to 70% larger than demand to serve critical, variable loads reliably, which adds to equipment needs.

Project tracking shows the same pull. As per industry findings, 56 GW of planned behind-the-meter generation at 46 US data centers, about 30% of planned US data center capacity, and about 90% of it announced in 2025. Another tracker counted 97 GW of gas projects planned to power data centers at the end of 2025, a figure that roughly doubled in the first half of 2026, with about 77 GW in Texas alone and engine capacity tied to data centers more than tripling to 45 GW.

The pressure is not limited to the United States. Global data centre consumption is expected to rise from 485 TWh in 2025 to 950 TWh in 2030, and in Ireland data centers used 22% of metered electricity in 2024. On 12 December 2025, Ireland’s energy regulator made onsite or nearby dispatchable generation or storage covering 100% of maximum import capacity a condition for new data center connections of 10 MVA or more, and behind-the-meter generation a condition for smaller sites above 1 MVA. In Germany, one regional grid operator had received 170 data center applications totaling 22 GW since 2022, of which only two data centers with 100 MW had been connected, as reported in July 2025.

Order Backlogs and Capacity Expansion at Equipment Makers

Equipment makers’ own reports show how much demand is already contracted. Caterpillar said on its 29 October 2026 call that Power Generation sales to users rose 75% in the third quarter, that total backlog reached a record $78 billion, up 96% year on year, that large reciprocating engine orders extend to 2029 and turbine orders into 2030, and that it aims to nearly triple large engine capacity from 2024 levels by 2030. Its 2026 Power & Energy investor presentation also cites a 2 GW primary power project for American Intelligence & Power and Williams built on gas engines.

GE Vernova reported on 28 October 2026 that its gas equipment backlog and slot reservations rose from 116 GW to 122 GW in the quarter and that it expects at least 130 GW under contract by the end of 2026. Cummins reported on 5 November 2026 that Power Systems sales rose 15% to $2.3 billion, with demand from data centers in the United States, China and Asia Pacific, and Bloom Energy’s third-quarter revenue rose 138.1% to $1,235.8 million, with 2026 guidance raised to $4.4 to $4.6 billion. Wärtsilä booked a 412 MW engine order for a hyperscale project in Ohio in April and a 282 MW order in October 2026.

Because delivery slots for large turbines and engines are sold out for years, makers are adding factory capacity and customers are placing orders further ahead, which gives the market a visible base of demand well into the 2030s.

Data Center Onsite Power Generation Regional Market Outlook:

North America is the largest market that holds around 45% market share, with 56 GW of planned behind-the-meter generation, 77 GW of data-centre-linked gas capacity in Texas, and double-digit growth in Caterpillar’s and Cummins’ North American power generation sales all point to the United States as the center of activity.

Asia Pacific holds an estimated 28% share with about 32 GW of planned data center capacity across roughly 1,150 projects in Asia-Pacific and calls grid availability the defining constraint, and regulators are placing reliability, battery storage and self-firming requirements on operators, while China promotes direct renewable supply to data centers. Cummins reports data center demand for its power generation equipment from China and Asia Pacific.

Europe holds an estimated 17% share, smaller today but with the strongest regulatory push toward onsite generation of any region. Ireland’s December 2025 connection policy requires new large data centers to bring their own generation or storage, Pure DC and AVK announced a 110 MW privately powered campus in Dublin in March 2026, and German grid waits that Ember puts at 7 to 10 years on average, as reported in July 2025, are pushing operators to consider their own plants. Ireland’s data centers used 22% of metered electricity in 2024.

Latin America holds an estimated 5.5% share supported by 2.5 GW of existing data center capacity in the region, growing by as much as 20% a year, with 540 projects totaling 20.1 GW tracked and almost 1 GW under construction.

Middle East & Africa holds an estimated 4.5% share with growth concentrated in the Gulf; Africa holds 0.6% of global data center capacity, installed capacity is expected to roughly triple to about 1.2 GW by 2030.

Key Companies in Data Center Onsite Power Generation Market:

Competition is concentrated at the top end and fragmented below it. A few turbine and large-engine makers supply most large projects, and delivery slots sold out into 2029 and 2030 give them pricing power and long visibility, while generator sets and smaller engines are served by many regional suppliers with shorter lead times. Fuel cells are led by a small group of specialists that compete on speed to power and emissions. Rivalry now centers on factory capacity and the ability to deliver complete plants, and suppliers are partnering with developers, independent power producers, gas suppliers and local installers to secure sites and shorten delivery. North America is a contest for capacity, while local service networks and regional partnerships are likely to matter more in Europe, Asia Pacific and the Gulf. Company shares are not shown because company revenue data for this market was not part of the input.

Key players include Caterpillar Inc., GE Vernova Inc., Cummins Inc., Wärtsilä Corporation, Bloom Energy Corporation, Siemens Energy AG, Mitsubishi Heavy Industries, Ltd., Rolls-Royce Holdings plc, Generac Holdings Inc., Kohler Energy, Doosan Enerbility Co., Ltd. and Others.

Key Developments in Data Center Onsite Power Generation Market:

1. Cummins Reports Power Systems Sales of $2.3 Billion: In November 2026, Cummins reported third-quarter Power Systems sales of $2.3 billion, up 15% year on year, with EBITDA of 25.4% of sales and demand from data centers in the United States, China and Asia Pacific.

2. Wärtsilä to Supply 282 MW Onsite Power for a US Data Center: In October 2026, Wärtsilä announced an order for 15 Wärtsilä 50SG engines totaling 282 MW for a data center project of a major US independent power producer, with delivery in 2028 and full operation in 2029.

Data Center Onsite Power Generation Market Attributes:

Market Value, 2025$US 13.1 Billion
Forecasted Market Value, 2036$US 30 Billion
CAGR (2026-2036)7.9%
Analysis Period2021-2036
Historic Period2021-2024
Base Year2025
Forecast Period2026-2036
Volume UnitNA
Value Unit$US Billion
Market SegmentationBy Power Source

  • Diesel Generators
  • Gas Generators
  • Renewable Energy
  • Fuel Cells
  • Others

By Application

  • Backup Power
  • Primary Power
  • Peak Shaving

By Generation Capacity

  • Up to 1 MW
  • 1-5 MW
  • Above 5 MW

By Data Center Type

  • Hyperscale
  • Colocation
  • Enterprise

By Region

  • North America (U.S. and Canada)
  • Europe (Germany, U.K., France, Italy, Spain, Poland, and Rest of Europe)
  • Asia Pacific (China, India, Japan, South Korea, Australia, and Rest of Asia Pacific)
  • Latin America (Mexico, Brazil, Argentina, and Rest of Latin America)
  • Middle East and Africa (Saudi Arabia, UAE, South Africa and Rest of Middle East and Africa)
Companies Profiles
  • Caterpillar Inc.
  • GE Vernova Inc.
  • Cummins Inc.
  • Wärtsilä Corporation
  • Bloom Energy Corporation
  • Siemens Energy AG
  • Mitsubishi Heavy Industries, Ltd.
  • Rolls-Royce Holdings plc
  • Generac Holdings Inc.
  • Kohler Energy
  • Doosan Enerbility Co., Ltd.
  • Others
Customization RequestAvailable upon request

1. Introduction
1.1. Report Scope
1.2. Market Segmentations and Definitions
1.3. Geographical Coverage
2. Executive Summary
2.1. Key Facts and Figures
2.2. Trends Impacting the Market
2.3. DatasticsR Growth Opportunity Matrix
3. Market Overview
3.1. Global Data Center Onsite Power Generation Market Analysis and Forecast, 2021-2036
3.1.1. Global Data Center Onsite Power Generation Market Size ($US Bn)
3.2. Key Market Trends
3.3. Technology Roadmap and Developments
3.4. Market Dynamics
3.4.1. Drivers
3.4.2. Restraints
3.4.3. Opportunities
3.5. Porter’s Five Forces Analysis
3.6. PESTL Analysis
3.7. Industry SWOT Analysis
3.8. Regulatory Landscape
3.9. Value Chain Analysis
3.9.1. List of Equipment Manufacturers
3.9.2. List of Dealers / Distributors
3.9.3. List of EPC Companies
3.9.4. List of Potential Customers
3.10. Impact of Current Geopolitical Scenario on the Market
4. Technical Analysis
4.1. Product Specifications Analysis
4.2. Technology Adoption and Emerging Trends
4.3. R&D and Parent Landscape
4.4. Cost Structure and Profitability Analysis
5. Global Onsite Power Generation Analysis (MWh), by Region, 2025
5.1. North America
5.2. Europe
5.3. Asia Pacific
5.4. Latin America
5.5. Middle East and Africa
6. Global Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
7. Global Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
8. Global Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
9. Global Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
10. Global Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Region, 2021-2036
11. North America Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
12. North America Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
13. North America Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
14. North America Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
15. U.S. Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
16. U.S. Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
17. U.S. Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
18. U.S. Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
19. Canada Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
20. Canada Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
21. Canada Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
22. Canada Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
23. Europe Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
24. Europe Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
25. Europe Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
26. Europe Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
27. Germany Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
28. Germany Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
29. Germany Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
30. Germany Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
31. U.K. Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
32. U.K. Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
33. U.K. Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
34. U.K. Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
35. France Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
36. France Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
37. France Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
38. France Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
39. Italy Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
40. Italy Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
41. Italy Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
42. Italy Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
43. Spain Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
44. Spain Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
45. Spain Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
46. Spain Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
47. Russia & CIS Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
48. Russia & CIS Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
49. Russia & CIS Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
50. Russia & CIS Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
51. Rest of Europe Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
52. Rest of Europe Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
53. Rest of Europe Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
54. Rest of Europe Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
55. Asia Pacific Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
56. Asia Pacific Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
57. Asia Pacific Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
58. Asia Pacific Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
59. China Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
60. China Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
61. China Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
62. China Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
63. India Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
64. India Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
65. India Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
66. India Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
67. Japan Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
68. Japan Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
69. Japan Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
70. Japan Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
71. South Korea Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
72. South Korea Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
73. South Korea Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
74. South Korea Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
75. Taiwan Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
76. Taiwan Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
77. Taiwan Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
78. Taiwan Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
79. Australia Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
80. Australia Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
81. Australia Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
82. Australia Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
83. ASEAN Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
84. ASEAN Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
85. ASEAN Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
86. ASEAN Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
87. Rest of Asia Pacific Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
88. Rest of Asia Pacific Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
89. Rest of Asia Pacific Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
90. Rest of Asia Pacific Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
91. Latin America Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
92. Latin America Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
93. Latin America Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
94. Latin America Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
95. Brazil Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
96. Brazil Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
97. Brazil Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
98. Brazil Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
99. Mexico Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
100. Mexico Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
101. Mexico Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
102. Mexico Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
103. Argentina Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
104. Argentina Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
105. Argentina Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
106. Argentina Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
107. Rest of Latin America Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
108. Rest of Latin America Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
109. Rest of Latin America Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
110. Rest of Latin America Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
111. Middle East & Africa Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
112. Middle East & Africa Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
113. Middle East & Africa Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
114. Middle East & Africa Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
115. Saudi Arabia Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
116. Saudi Arabia Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
117. Saudi Arabia Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
118. Saudi Arabia Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
119. UAE Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
120. UAE Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
121. UAE Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
122. UAE Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
123. South Africa Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
124. South Africa Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
125. South Africa Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
126. South Africa Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
127. Rest of Middle East & Africa Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Power Source, 2021-2036
128. Rest of Middle East & Africa Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Application, 2021-2036
129. Rest of Middle East & Africa Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Generation Capacity, 2021-2036
130. Rest of Middle East & Africa Data Center Onsite Power Generation Market Analysis and Forecasting ($US Bn), by Data Center Type, 2021-2036
131. Competition Landscape
131.1. Market Share Analysis (%), by Company, 2025
131.2. Competitive Benchmarking
131.3. Company Profiles
131.3.1. Caterpillar Inc.
131.3.1.1. Company Overview
131.3.1.2. Business Portfolio
131.3.1.3. Financials
131.3.1.4. Geographical Footprint
131.3.1.5. SWOT Analysis
131.3.1.6. Recent Developments and Strategies
131.3.2. GE Vernova Inc.
131.3.2.1. Company Overview
131.3.2.2. Business Portfolio
131.3.2.3. Financials
131.3.2.4. Geographical Footprint
131.3.2.5. SWOT Analysis
131.3.2.6. Recent Developments and Strategies
131.3.3. Cummins Inc.
131.3.3.1. Company Overview
131.3.3.2. Business Portfolio
131.3.3.3. Financials
131.3.3.4. Geographical Footprint
131.3.3.5. SWOT Analysis
131.3.3.6. Recent Developments and Strategies
131.3.4. Wärtsilä Corporation
131.3.4.1. Company Overview
131.3.4.2. Business Portfolio
131.3.4.3. Financials
131.3.4.4. Geographical Footprint
131.3.4.5. SWOT Analysis
131.3.4.6. Recent Developments and Strategies
131.3.5. Bloom Energy Corporation
131.3.5.1. Company Overview
131.3.5.2. Business Portfolio
131.3.5.3. Financials
131.3.5.4. Geographical Footprint
131.3.5.5. SWOT Analysis
131.3.5.6. Recent Developments and Strategies
131.3.6. Siemens Energy AG
131.3.6.1. Company Overview
131.3.6.2. Business Portfolio
131.3.6.3. Financials
131.3.6.4. Geographical Footprint
131.3.6.5. SWOT Analysis
131.3.6.6. Recent Developments and Strategies
131.3.7. Mitsubishi Heavy Industries, Ltd.
131.3.7.1. Company Overview
131.3.7.2. Business Portfolio
131.3.7.3. Financials
131.3.7.4. Geographical Footprint
131.3.7.5. SWOT Analysis
131.3.7.6. Recent Developments and Strategies
131.3.8. Rolls-Royce Holdings plc
131.3.8.1. Company Overview
131.3.8.2. Business Portfolio
131.3.8.3. Financials
131.3.8.4. Geographical Footprint
131.3.8.5. SWOT Analysis
131.3.8.6. Recent Developments and Strategies
131.3.9. Generac Holdings Inc.
131.3.9.1. Company Overview
131.3.9.2. Business Portfolio
131.3.9.3. Financials
131.3.9.4. Geographical Footprint
131.3.9.5. SWOT Analysis
131.3.9.6. Recent Developments and Strategies
131.3.10. Kohler Energy
131.3.10.1. Company Overview
131.3.10.2. Business Portfolio
131.3.10.3. Financials
131.3.10.4. Geographical Footprint
131.3.10.5. SWOT Analysis
131.3.10.6. Recent Developments and Strategies
131.3.11. Doosan Enerbility Co., Ltd.
131.3.11.1. Company Overview
131.3.11.2. Business Portfolio
131.3.11.3. Financials
131.3.11.4. Geographical Footprint
131.3.11.5. SWOT Analysis
131.3.11.6. Recent Developments and Strategies
131.3.12. Others
132. Appendix

- Get Started -

Get insights that lead to new growth opportunities
Quantity

    - Talk to Experts -

    Get answers to your queries on this report from our experts

    Frequently Asked Questions

    The global Data Center Onsite Power Generation market in 2025 was $US 13.1 Billion.
    The global Data Center Onsite Power Generation market will be $US 30 Billion by 2036.
    The expected growth rate (CAGR%) of the global Data Center Onsite Power Generation market is 7.9% for the period 2026-2036.
    Grid Connection Delays and the Race to Secure Power Quickly and Order Backlogs and Capacity Expansion at Equipment Makers.
    Diesel Generators was the largest segment in power source with around 42.3% revenue share among all in Data Center Onsite Power Generation Market in 2025.
    North America was the leading regions for Data Canter Onsite Power Generation holding 45% of the global market in 2025.
    Caterpillar Inc., GE Vernova Inc., Cummins Inc., Wärtsilä Corporation, Bloom Energy Corporation, Siemens Energy AG, Mitsubishi Heavy Industries, Ltd., Rolls-Royce Holdings plc, Generac Holdings Inc., Kohler Energy, Doosan Enerbility Co., Ltd. and Others.